Surveying Regulations in Montana: What Every Landowner Should Know

November 12, 2025

If you own property or plan to develop land in Montana, understanding surveying regulations isn’t just helpful — it’s essential.


State and county laws govern everything from how your property boundaries are defined to who is authorized to perform a survey.


At Prairie Point Land Surveyor, we follow Montana’s professional standards to ensure every survey is legally valid, accurate, and recognized by local authorities.


Here’s what every Montana landowner should know about surveying laws, certifications, and compliance.

Why Surveying Regulations Exist

Surveying regulations protect property rights.


They ensure that every boundary, easement, and subdivision is defined with consistent accuracy — no matter where you are in the state.


Without regulation, land boundaries could be measured inconsistently, leading to overlapping ownership, disputes, or invalid titles.


Montana’s surveying standards guarantee that your property data is legally defensible and professionally verified.

Licensed Surveyors Only

In Montana, only a licensed professional land surveyor (PLS) can legally perform, certify, or record a land survey.


This license is regulated by the Montana Board of Professional Engineers and Land Surveyors under state law (Title 37, Chapter 67, MCA).


To become licensed, surveyors must:

  • Earn an accredited surveying or geomatics degree
  • Pass national and state-specific examinations
  • Complete verified professional experience
  • Maintain continuing education for license renewal


When you hire Prairie Point, you’re working with a licensed surveyor who meets every one of these requirements — ensuring your survey is compliant, accurate, and recognized statewide.

The Montana Subdivision and Platting Act

For property divisions or lot boundary adjustments, the Montana Subdivision and Platting Act (Title 76, Chapter 3, MCA) governs how land can be legally subdivided and recorded.


This law ensures:

  • Subdivisions meet local zoning and infrastructure requirements
  • Survey plats are reviewed and approved by county authorities
  • Lot boundaries, easements, and access are properly documented


If you’re planning to split, combine, or sell part of your property, your survey must follow these regulations before it can be recorded at the county clerk and recorder’s office.

Monumentation Requirements

Montana law requires that surveyors set permanent corner monuments — such as iron pins, caps, or stones — to physically mark the boundaries they certify.


Each monument must include a durable identifier (like the surveyor’s license number or cap stamp).


These monuments:

  • Provide lasting reference points for future surveys
  • Ensure your boundary can be reestablished accurately
  • Are protected under Montana law — removing or altering them without authorization is illegal (per MCA 45-6-101).


When Prairie Point performs a survey, we verify, reset, or replace every required monument so your property boundaries remain clearly and permanently marked.

Recording and Legal Standing

Once a survey is completed, certain types — such as subdivision plats, boundary line adjustments, or retracements — must be filed with the county.


The recorded plat becomes a public document and the official reference for your property’s limits.

In Montana, a recorded plat must:

  • Include the surveyor’s seal and signature
  • Reference deed descriptions and adjoining surveys
  • Be reviewed for compliance with Administrative Rules of Montana (ARM 24.183)


This record ensures long-term protection for your ownership boundaries and helps prevent future title disputes.

Why Compliance Matters for Homeowners

Even if you’re not subdividing, compliance still affects you.


If a fence, shed, or addition crosses a boundary line, the county or a neighbor may request a recorded survey to verify property limits.


An uncertified or informal measurement won’t hold up in court or for permitting.


Working with a licensed, compliant surveyor gives you:

  • Legal documentation for property transfers
  • Verified data for permits and construction
  • Confidence that your property corners meet Montana’s legal standard


In short — a compliant survey is your proof of ownership boundaries.

Common Missteps to Avoid

  1. Hiring an unlicensed individual to “mark corners” — it’s not legally valid.
  2. Skipping survey updates after construction or parcel adjustments.
  3. Failing to record plats after land division, delaying title updates.
  4. Ignoring easement documentation, which can create access conflicts.


Prairie Point helps you avoid these issues by managing the entire process: research, fieldwork, certification, and county recording.

How Prairie Point Ensures Regulatory Accuracy

Our Billings-based survey team follows every Montana Board and county standard precisely.


Each certified drawing includes:

  • Official seal and signature of a licensed surveyor
  • Legal description consistent with deeds and records
  • Monumentation details
  • Compliance with ARM 24.183 and Title 76-3-401 MCA


We handle communication with local permitting and recording offices so you can focus on your project — knowing your survey meets every requirement.

Final Thoughts

Surveying regulations may seem technical, but they’re there to protect you.


When your survey is performed by a licensed, compliant Montana surveyor, you gain peace of mind — knowing your property lines, records, and rights are secure.


At Prairie Point Land Surveyor, accuracy and compliance aren’t optional. They’re the foundation of every project we complete.

Call to Action

Need a compliant, certified survey in Montana?


Contact Prairie Point Land Surveyor today for a quote or consultation.


We’ll ensure your boundary, subdivision, or title survey meets every Montana standard — accurately and on time.

Fence line with orange caps stretches across a grassy field, distant hills in the background.
February 11, 2026
Not sure if you need a land surveyor? Learn when boundary, topographic, or ALTA surveys are required for buying, building, or dividing property in Montana.
Fence running through a snow-covered field towards rolling hills under a blue sky.
January 28, 2026
Learn the difference between boundary and topographic surveys and when each is required. Understand how the right survey supports design, permitting, and ownership clarity.
A survey marker,
January 21, 2026
Learn what benchmark elevations are and why they matter for engineering and construction. Accurate survey control supports grading, drainage, and compliant builds in Montana.
Two surveying instruments on tripods in a field: GPS receiver with antenna and a theodolite.
January 14, 2026
Modern GPS and surveying equipment improve measurement accuracy and reliability. Learn how today’s tools support precise, compliant land surveys in Montana.
Construction site with excavators, orange safety fencing, and mountain backdrop.
January 7, 2026
Planning a development project in Montana? Learn which surveys and site documents to include in your 2026 development checklist to avoid delays and stay compliant.
Snow-covered field with a fence in front of snow-capped mountains under a clear blue sky.
December 17, 2025
Learn how winter conditions affect land surveying in Montana and how experienced surveyors deliver accurate, reliable results year-round
Aerial view of two commercial buildings with parking, set in a field near mountains.
December 10, 2025
Learn why commercial buyers need an ALTA/NSPS Land Title Survey in Montana.
Barbed wire fence with weathered wooden posts, spanning across a dry, grassy plain under a bright blue sky.
December 4, 2025
Learn how a certified boundary survey resolves property corner disputes in Montana. Understand how survey data protects ownership and clarifies legal property limits.
Rolling golden hills with rippled patterns, dotted with trees, under a clear blue sky.
November 26, 2025
Learn when you need a topographic survey in Montana and why accurate elevation data is essential for design, drainage, and construction planning.
Aerial view of a house plan overlaid on a dirt lot, showing a curved driveway and surrounding trees.
November 19, 2025
Get a certified site plan that meets Montana permitting standards. Learn how accurate survey data supports zoning compliance, construction planning, and smooth permit approval.